Inspection for metal dome array

Please follow me to know the Inspection procedures for metal dome array.

1). Appearance of PET, it should be clean(no dirt, no Scratching);
2). Metal dome missed or double metal domes?  Can not stick together.
3) No Bubble in Assembly
4). The location of each dome is the same as the drawing of the PCB?
5). If there is EMI printing, pleas take care of the quality of the tracing;
6). Others, such as data of location holes, outline, etc.

Four-leg metal dome

Four-leg metal dome

triangle peel place dome

triangle peel place dome

If you are interested in metal dome & metal dome array, you can visit to products’s page for C (Circle) , F (4-Legs) , T (Triangle) , O (Oblong) Custom

If you would like to know  the packing method of metal dome & metal dome array, please visit to Metal Dome Packing for  In Bulk, In Tube, Tape & Reel, Peel & Place (Array).

You may also like

This entry was posted in FAQ. Bookmark the permalink.